DRAINAGE Location Project Description Project Status
Dalyellup College Drainage Basin Dalyellup Investigation (Report) – Flooding of playing field Planning Stage
Drainage Asset Register Shire wide Update asset register with all available information and make publicly available Planning Stage
Shire of Capel Drainage Strategy Boyanup Boyanup LWMS to support Drainage Strategy Planning Stage
Jilley Road Gelorup Replace Existing Culvert + Headwalls Planning Stage
Gavin’s Road Capel Replace Existing Culvert + Headwalls Planning Stage
Weld Road Capel River Replace Existing Culvert + Headwalls Planning Stage
Weld Road Capel River Replace Existing Culvert + Headwalls Planning Stage
Roe Road Capel Correction of ponding to the pram ramp adjacent to Capelberry. Planning Stage
Frances Road Gelorup Extend culvert south 4.5m to allow for footpath construction. Relocate adjacent headwall and backfill verge. Planning Stage
Hasties Rd Drain reserve             TPS 3 outstanding works 2f Gelorup Reshape the open channel from Hasties Rd to Five Mile Brook to provide a long term manageable cross-section for the main flow path of water from catchments A and B. Planning Stage
Reshape Lake McNish                   TPS 3 outstanding works 2h Gelorup Confirm volume and reshape detention basin north of Hasties Rd Planning Stage
Open Drain west of Jules Rd between R 29470 and R 45489 Gelorup Undertake survey and implement works to reinstate shallow drain through reserve and BCGS land to alleviate flooding of Lot 115 Strachan Crt Planning Stage

 

PUBLIC OPEN SPACE & LAND Location Project Description Project Status
Capel Rec Ground – Remediation Capel Part 1 – SCMP to be completed (MC)
Part 2 – Site remediation (SF) – carry over to 18/19
Planning Stage
Wonil Crescent Dalyellup Upgrade to playground equipment Planning Stage
Central Lakes – Senior playground Dalyellup Upgrade to playground equipment Planning Stage
Ferndale Park Dalyellup Install new shade sail Planning Stage
Boyanup Recreation Ground Area Exercise Equipment Boyanup Upgrade to exercise equipment Planning Stage
Capel Civic Precinct – Stage 3 Capel Construction & Delivery of Capel Civic Precinct Stage 3 Planning Stage
Capel Civic Precinct – Stage 3A Capel Construction & Delivery of Capel Civic Precinct Stage 3A car park Planning Stage
Shire Entry signs x 3 Picton. Boyanup Rd.
Tuart Drive.
Goodwood Road.
Install 3 x new Shire Entry signs Planning Stage
Town Entry Statement Spurr Road, Capel Install new Town Entry Statement Planning Stage
Lions Park shelter & BBQ Boyanup Install new shelter, BBQ, pad, fence and relocate existing bench Quotes received
Native Garden Capel Cemetery Introduce low maintenance garden Planning Stage
Fettlers Park Master Plan – Design Boyanup Detailed Design of Fettlers Park Development Planning Stage
Age Friendly Seating Shire wide Seating Planning Stage
Capel Cemetery Capel Signage, kerb and road repairs Planning Stage
Peppermint Grove Beach fencing Peppermint Grove Beach Fencing Planning Stage
Shire wide – POS signage, seats, shelters, bins Shire wide POS signage, seats, shelters, bins Planning Stage
Galvanized Leaves- Public Art Capel Install Tuart leaves Sculpture with lighting Quotes received

 

PATHS Location Project Description Project Status
Bussell Highway Dual Use Path (Phase 3)  Dalyellup/      Gelorup Design and Construction 2.5m wide concrete path Planning Stage
Pedestrian Ramp Improvements Dalyellup Various new pedestrian ramps, in response to customer requests Planning Stage
South West Hwy Boyanup replace existing asphalt path Planning Stage
South West Hwy Boyanup replace existing asphalt path Planning Stage
South Western Hwy – Railway Xing Boyanup Planning Stage
West Rd Capel Construct 2.1m wide concrete path Request For Quotation

 

ROADS Location Project Description Project Status
Boundary Road Boyanup 2nd coat seal (10mm) Planning Stage
Elgin Road Elgin Reconstruct; 6.2m seal + 0.9m shoulders Planning Stage
Elgin Road Elgin 2nd coat seal (10mm) Planning Stage
Ludlow North Road Ludlow Improve and widen intersection (Stirling Road) Planning Stage
Clarke Road Elgin Reseal to 4.0m Planning Stage pre seal repairs
Clarke Road Elgin Reseal to 6.2m Planning Stage pre seal repairs
Clarke Road Elgin Reseal to 4.0m Planning Stage pre seal repairs
Hurst Road Boyanup Plane and asphalt overlay Planning Stage
Kilpatrick Road North Boyanup Gravel resheet Planning Stage
Fowler Road Boyanup Gravel resheet Planning Stage
Hansen Road Stratham Gravel resheet Planning Stage
Hansen Road Stratham Clearing, realignment and gravel sheeting Planning Stage
Brookdale Road Boyanup Widen formation to 9.0m, improve drainage, clear verges Planning Stage
Simmons Street Boyanup Plane and asphalt overlay Planning Stage
Properjohn Road Capel Reseal to 7.0m Planning Stage
Jules Road North Gelorup Widen formation to 9.0m – Design and preconstruction Planning Stage
Kent Road Stratham Cul-de-sac; repair pavement, install edge kerb, asphalt overlay Planning Stage – measured
Child Place Stratham Cul-de-sac; repair pavement, install edge kerb, asphalt overlay Planning Stage – measured
Ducane Road Gelorup Reseal at 6.2m (10mm) Planning Stage – tree pruning completed
Calinup Road Stratham Design for Reconstruction – Shoulder Slumping Planning Stage
Boyanup Road West Boyanup Realign & widen intersection Clearing complete
Boyanup Road West Boyanup Realign and widen intersection (Elgin Road) – 2nd coat seal Planning Stage
Boyanup Road West Boyanup Final Design, Staging & Schedule Preparation Planning Stage
Dalyellup Bvd Dalyellup Asphalt overlay and kerb repairs Planning Stage
Dalyellup Bvd Dalyellup Asphalt overlay and kerb repairs Planning Stage
Norton Promenade – Left Dalyellup Asphalt overlay and kerb repairs Planning Stage
Norton Promenade (1510) Dalyellup Asphalt overlay and kerb repairs Planning Stage
Norton Promenade – Right Dalyellup Asphalt overlay and kerb repairs Planning Stage
Parade Road – Left Dalyellup Pavement rehabilitation and asphalt resurfacing (Murtin Road) Planning Stage
Parade Road – Right Dalyellup Pavement rehabilitation and asphalt resurfacing (Murtin Road) Planning Stage

 

BUILDINGS Location Project Description Project Status
Boyanup POS Recreation Facilities Boyanup Upgrade Bowling Club Sports Pavilion + facilities Planning Stage
Jamison Footbridge Capel Upgrade Planning Stage
Timber Structures -2 Shire wide North Beach Access Stairway Dalyellup Beach Planning Stage
Timber Structures -3 Shire wide DalyellupTimber Structures – lake link ramp Planning Stage
Roof Access Anchor Points Shire wide Upgrade Planning Stage

 

BRIDGES Location Project Description Project Status
Bentley Road Bridge Ludlow Waterways analysis Planning Stage
Dardanup West Road Bridge Dardanup Includes approach road of DW Rd Planning Stage

Long term Program of Works Planning

Program of Works – Paths (2017 – 2022) 

Program of Works – Roads (2017 – 2022)

Program of Works – Drainage (2017-2018)